How did ICAX create ThermalBanks?
Previously GSHP installers used buried pipes to collect heat from the ground in winter by heat exchange. ICAX realised that a second function – heat storage to the ground in summer – could be added to existing building fabric – pipes in the ground – to boost the performance of heat collection in winter.