How detailed should the field comments be?
The comment field in the drain point is important to fill in when something unusual is occurring. The stream crossing field will always need a comment indicating if the point is located on the TauDEM channel network or not. In some cases stream crossing points will need to be snapped to register with the TauDEM streams, and this requires some field input to determine if a channel is a 2nd order or a 4th order channel. top I am unclear on how multiple flow paths are handled by the model. If all the flow from an in sloped road routes to the same drain point, do I need to enter the drain identifier in both TIME1 and Time2? If you enter the drain point identifier only once, GRAIP will route half of the sediment to the drain and assume that the other half is not delivering. If the full width of the road is delivering to the drain then enter the drain identifier in both TIME 1 and TIME2. If the road is truly crowned and only delivers from one side, then enter 999 in the TIME2 filed of the ro
How detailed should the field comments be?