How can the assessment tool be configured?
There are several tabs at the MainReport.xls file that is produced by the assessment tool that contain its configuration settings. The Config – General tab allows you to configure the estimated effort for specific upgrade issues, such as correcting and verifying every 1,000 lines of code. Resource costs can be found in the Config – By Resources tab. They represent an estimation of development resources required to resolve an upgrade issue. The Config – Fixed Tasks table introduces a set of processes to be accomplished in any upgrade project by the resources listed on the Config – By Resource tab. And finally, the Config – EWIs tab displays information about the upgrade estimates for EWIs.