How can I obtain a water and/or sewer fee quote?
Water and sewer capacity or connection fees are charged when a property owner connects to the District’s facilities. These one-time fees enable new customers to buy into the District’s system of wells, reservoirs, and treatments plants. The fees are due before the meter is installed and the home is connected to sewer. You can talk to an Engineering staff member for a verbal fee quote for planning purposes. Please be sure you have the Assessor’s Parcel Number of the property at the time you call for information. Other Engineering fees that will apply to tract or commercial development, and are based on the Engineering Cost Estimate of constructed facilities, are plan check fees calculated at 3% and water and sewer inspection fees calculated at 8%.