How can I most efficiently and effectively change the work group paradigm around getting the job done fast, and not necessarily the safest way?
Getting the job down fast is not always best way to improve throughput. Adding a Integrated Safety PLC System allows for quick Isolation of problems in safety circuit which keep the plant up and running. Using a PLC also allows for more safety zones of coverage which allows only part of the machine effected by the safety issue to shut down, hence improved uptime. The other major down fall or getting the job down quickly is safety circuit are sometime disabled which may seem to improve throughput but with the additional injuries and potential fatalities the legal fees and insurance premium increase outweigh the marginal increase in throughput. The benefit to a safety PLC system it is extremely hard to override the safety systems.
Related Questions
- How can I most efficiently and effectively change the work group paradigm around getting the job done fast, and not necessarily the safest way?
- What is the Reporting Obligation and Responsibility of the The Bagg Group when a worker is injured on the job?
- If I see a job posting I like, do I contact WebServesUs or the Member group?