How can a firm receive an extension of time to undergo a peer review?
Should an extension of time be needed to have a peer review report accepted by a Board-recognized peer review program, the firm shall submit the extension request to the Board-recognized peer review program provider with which the firm is enrolled. If the extension granted extends past the firm’s reporting date, the firm shall notify the CBA of the extension and provide proof of the extension. The firm shall then report the results of the peer review to the CBA within 45 days of the peer review report being accepted by the Board-recognized peer review program.