How big is the university of Phoenix Stadium?
Facility information The 63,400-seat stadium (expandable to 72,200) opened on August 1, 2006 after three years of construction. It is considered an architectural icon for the region and was named by Business Week as one of the 10 “most impressive” sports facilities on the globe due to the combination of its retractable roof and roll-in natural grass field[2]. It is the only American facility on the list. The ceremonial groundbreaking for the new stadium was held on April 12, 2003. The cost of the project was $455 million. That total included $395.4 million for the stadium, $41.7 million for site improvements, and $17.8 million for the land. Contributors to the stadium included the Arizona Sports and Tourism Authority ($302.3 million), the Arizona Cardinals ($143.2 million), and the City of Glendale ($9.5 million). The playing field outside and lined for the Arizona Cardinals. The roof of University of Phoenix Stadium. The first preseason football game was played August 12, 2006 when th
University of Phoenix Stadium is a multipurpose football stadium located in Glendale, Arizona. It is the home of the Arizona Cardinals of the National Football League (NFL) and the annual Fiesta Bowl. The new stadium is located next door to the Jobing.com Arena, where the NHL’s Phoenix Coyotes play, and it has the first fully retractable natural grass playing surface built in the United States. An opening on one side of the stadium allows the playing field to move to the exterior of the building, both allowing the entire natural turf playing surface to be exposed to daylight when it is not in use and allowing the floor to be used for other purposes without damaging the playing surface. University of Phoenix Stadium hosted Super Bowl XLII and the 2007 BCS National Championship Game, a game that it hosts quadrennially. The University of Phoenix, a for-profit university specializing in adult education, acquired the naming rights in September