How are WHP buildings constructed?
The building process begins with the erection of the internal framework of structural Cees and floor joists. Structural panels are attached to the structural Cees and joined together with 3/8″ diameter bolts (each able to support 1,400 pounds) at 6″ intervals. Seams are sealed with top quality elastomeric strip caulking, making the building weathertight. Every structural component is at least 18 gauge and NO OTHER TRAINING TOWER PROVIDER routinely seals each and every seam.