How are the last two handled under the consolidated regulations if they are non-hazardous wastes?
They are covered in Title 27 in the same way as they were under Chapter 15. Q: What Article 5 compliance costs should be included in cost estimates for preliminary or final closure and post-closure maintenance plans? A: For closure plans, the estimate should cover all costs not associated with monitoring programs (i.e.: cover materials, CQA, cover installation, alteration of run-on and run-off). The estimate for post-closure maintenance includes all costs except those for a “reasonably foreseeable release”, including those for the monitoring program(s). Q: Under what circumstance is an engineered alternative analysis not acceptable even though the performance is demonstrated to be better than the prescriptive design? A: In a case where the prescriptive standard will meet the performance standard and the alternative costs more. This cost restriction does not apply in cases where the discharger shows that the prescriptive standard would not meet its applicable performance standard. Q: Is
Related Questions
- My Grant began before the consolidated regulations (100600 series) became effective and is governed by the 100300 series. How will CIRM apply the term "broadly commercially available" in 100304?
- How are the last two handled under the consolidated regulations if they are non-hazardous wastes?
- Which regulations will be consolidated into the new Logistics Management regulation (14 FAM)?