How are second floor joists supported?
Most often the second floor joists are set on top of the first floor walls, the same as in conventional framing. In areas where additional support is needed, or where there are no first floor walls, the second floor may be hung from the dome shell by anchoring a 5/8″ threaded rod vertically into the concrete of a seam. This weight is suspended by threaded steel rods which anchor into the concrete seams and extend vertically down into the dome. Over 3,000 lbs. can be supported by a 5/8″ threaded rod suspended in one of the concrete seams. The location of the suspension rods is determined by your floor plan selection. The Building Plans will show the suspension rod’s positioning. The suspension rod with nut sets on a 3″x7″ steel plate, which is embedded in the concrete seam. The seam is reinforced with #4 rebar & two layers of galvanized steel mesh. These suspension rods and plates can be purchased from American Ingenuity. A 6′ long 5/8″ threaded suspension rod with upper plate and botto