How are drawings and test procedures updated to reflect the latest changes?
All drawings and test procedures are maintained under document control. An engineering change notice is initiated and approved whenever a change is required. 32. Is sampling inspection performed in compliance with established, recognized standards? If so, please indicate standards used. Yes, sampling plans are based on Mil-Std-105.
All drawings and test procedures are maintained under document control. An engineering change notice is initiated and approved whenever a change is required. Top 32. Is sampling inspection performed in compliance with established, recognized standards? If so, please indicate standards used. Yes, sampling plans are based on Mil-Std-105.