How are Alumawood™ shade structures installed?
They are installed either free-standing with posts embedded in concrete footings or attached to the wall / eave and the posts installed with post brackets to a concrete slab or concrete footings.* Installation time is dependent on the size of the cover. Most standard sizes require less than one day for an experienced installation team (time applies to freestanding units after posts are poured into footings and concrete is cured).