How and when are the fittings installed?
The EMMEDUE panel makes the installation of fittings rapid and easy. The phases of the putting-in-place process for the tubes of the electrical and the hydro-sanitary systems are performed after the complete assembly of the panels and before completion with the plaster and the spritz-beton. The chases are realized directly in the polystyrene with a jet of hot air. Then, if the tubes are flexible, they are inserted behind the net and are made to go along the path of the chase. In the case of rigid tubes, the net is cut in proximity of the chase, the conduit of the fittings is placed and then the continuity of the steel is restored joining a plane net to the net that is already present in the panel.