For a project using the TRCR, does the bidder need to estimate the cost of upgrades needed to bring power to a given cluster, assuming the interconnection point is not the same point as the cluster?
Related Questions
- For a project using the TRCR, does the bidder need to estimate the cost of upgrades needed to bring power to a given cluster, assuming the interconnection point is not the same point as the cluster?
- There is some information (e.g., project number) that I don know yet; how much information do I need to create a plan and cost estimate?
- What information does Stylus Design need to estimate the cost of my project?