During active remediation, are two bids for excavation still required?
Two bids are required for excavation during active remediation unless the excavation is related to system installation. For example, two bids would not be required for excavation of trenches required for the installation of system piping if system installation is included in the consultant proposal. Two bids would be required for excavation of contaminated soil done as a corrective action in and of itself.