Doesn’t VTrans already have the permits to build a particular highway design?
Permits were granted for the earlier design that was about to go into construction in May 2004. Depending on the preferred alternative resulting from the Circ-Williston EIS, these permits may remain applicable, require modification, or be inapplicable. The existence of the permits will not be a consideration in the EIS.