Does the design loading of the temporary support structure include ice impact?
The design loads provided are the minimum required by the performance specification, but are not all inclusive. All necessary design loads shall be at the discretion of the engineer. Please refer to the additional clarification regarding design loads in this Addendum. Q: Can a crane be placed near the southwest corner of the bridge? A: A crane may be placed, but the embankment must be adequately built up to create a flat surface. A plan or sketch of the proposed embankment must be provided before construction, for review and approval. Q: Will all environmental permits be secured before Notice to Proceed? A: Yes. Notice to Proceed will not be granted until all environmental permits have been secured. Q: What are the MBE/WBE requirements for this project? A: Since this project is entirely County funded, there are no MBE/WBE requirements. Q: What type of finish is required for the temporary support structure? A: Any type of finish may be used, provided the temporary support structure can