Does the Conservation Commission ever permit construction within 100 feet of wetland?
The Commission has permitted some construction in hardship situations, often involving an existing septic system that has failed. In these cases, the minimum distances required between a septic system and a domestic well leave no other option but to put a portion of the leaching field within the 100-foot zone. The Commission has taken the position that such alterations are allowed because it is better to reduce the risk of groundwater pollution by making certain that failing septic systems are replaced by new Title V systems.
Related Questions
- The Conservation Commission has approved a project and given a permit that I don believe will protect the river. What can I do as a citizen?
- Has a delineation of wetland resources been approved by the Freetown Conservation Commission?
- What type of activity requires a permit from the Chatham Conservation Commission?