Does the combined distribution system determine the number of sample sites?
Related Questions
- If the distribution system flow in the above sample was 300 gpm, would the NO-DES system have to produce the 441 gpm plus 300 gpm to achieve the desired opposite velocity inside the target 6" main?
- Does EnviroESI sample of the waste streams to determine if I can use their system?
- Do demand interconnects count for the combined distribution system?