Does the City of Stockton replace meter boxes (new subdivision) when a contractor breaks them?
All meter boxes are installed at the time the subdivision is being established. If the contractor is calling and says the meter box is broken, it is his responsibility to replace it. If he calls and says the meter box is missing or that there is no meter box, it could have possibly been removed by another contractor, however, it is the contractor’s responsibility to replace the box.