Does qualifications-based selection increase project costs?
A No. There can be an inverse relationship between the cost of design and the much larger cost of constructing and operating the ultimate facilities. Sufficient funds invested in engineering and architectural design services, that are generally a very small percentage of total construction costs, will bring out the most cost-effective requirements for a successful project through consideration of alternative methods and materials, life-cycle cost factors and costs of operation and maintenance of the facility. In a price-based competition for architectural and engineering services, potential design savings to you, the owner, are likely to be more than offset by higher construction costs resulting from less than optimal design considerations.
Related Questions
- How does evolution through natural selection result in changes in biodiversity through the increase or decrease genetic diversity within a population?
- Does Seropositivity for Helicobacter pylori Antibodies Increase Outpatient Costs for Gastric and Duodenal Ulcer or Inflammation?
- What are the costs for the pilot project and long-term use of SAP HR software?