Does energy need to be delivered to the grid under the Long-Term Master Agreement or it possible to deliver to the distribution system? Would a facility under a ComEd POG rate be precluded?
Please see the Confirmation of the Long-Term Master Agreement. The seller under the Long-Term Master Agreement must deliver the energy to a transmission system or an electric utility distribution system. If the seller interconnects with a transmission provider that is not part of a regional transmission organization or is interconnected at the distribution level and settles energy deliveries with the distribution utility or sells energy to the distribution utility, the seller must generate and physically deliver the energy to the transmission system of the transmission provider with which it is interconnected or to the distribution system of the utility with which it is interconnected. This requirement precludes a Project under a net metering arrangement or an arrangement where the power is used behind the meter. It would not preclude buy all/sell all arrangements that can be associated with PURPA QF facilities. It would not preclude a Project under a ComEd POG rate. 9/10/2010, in Long