Do I need to hire a licensed well driller to install closed loop geothermal borings used in conjunction with heat exchangers to heat homes?
No. However, if the construction of the boring may cause waste or contamination of the ground water, it must be treated as a borehole pursuant to NAC 534.4369 and 534.4371. Also, as long as there is no consumptive use, a water right does not need to be obtained from the state engineer. The Division of Minerals should be contacted prior to these installations however.