Did the MDEQ require Kennecott to address the issues raised in the report?
Yes. MDEQ required that Kennecott address the issues raised by the technical consultant. The technical consultant who had initially raised the issues agreed that Kennecott’s proposed engineering and method of addressing the issue was the appropriate path to take. The consultant submitted a subsequent memorandum (November) to MDEQ to this effect.