Can you conform material of construction (in-situ) for fittings of our super heated steam line by alloy analyzer?
TCR Engineering Services of Mumbai, India. routinely performs XRF based Positive Material Identification (PMI). We would require 3 to 4 days of notice to mobilize our engineering team. Please note that the team along with the XRF based instrument will be provided to you from our office in Mumbai, India. There will be a per day charge for on-site work including T&E charges.
Related Questions
- Sharp spikes in fuel prices, material costs for substations and power line construction, and wholesale power costs continue to impact the rates that members pay for electricity each month. WHY didn the co-op give us more notice about the additional charges to the GRE Power Cost Rider(s)?
- Can you conform material of construction (in-situ) for fittings of our super heated steam line by alloy analyzer?
- How is the evaporation material heated to boiling?