Can you conduct Acetic Acid- Salt Spray (fog) testing as per ASTM-B287-80 on M.S. Pipes?
We do have a Salt Spray Chamber and therefore we feel that there should be no problem in conducting this test. We normally carryout Salt Spray Test with 5% NaCl solution or as stated in ASTM-B287-80 the solution should have its Ph adjusted to 3.2 by Acetic Acid. We propse to have an observation interval of 24 hours each for a total of the 96 hours duration test. We would need about one weeks time to complete the job depending on prior commitments for salt spray chamber. Top We would like to know whether you can perform LPR corrosion testing. At TCR, we do not undertake LPR Corrosion testing, as we do not have the requisite facilities.
We do have a Salt Spray Chamber and therefore we feel that there should be no problem in conducting this test. We normally carryout Salt Spray Test with 5% NaCl solution or as stated in ASTM-B287-80 the solution should have its Ph adjusted to 3.2 by Acetic Acid. We propse to have an observation interval of 24 hours each for a total of the 96 hours duration test. We would need about one weeks time to complete the job depending on prior commitments for salt spray chamber.