Can trusses be modified at the jobsite?
NO, unless approved in advance. Superior Truss is legally responsible for the engineering integrity of the light gauge steel truss system. Only Superior Truss can authorize field repairs in writing in advance. The required modifications or repairs are required to be documented by engineered, stamped truss modification drawings designed specifically for the modification or repair. If modifications or repairs are completed without approved stamped truss modification drawings, all truss warranties and support will be null and void and the party making such modifications or repairs will take full legal responsibility for the structural performance of the roof system.