Can Timber frame and panel shorten the construction cycle ?
In association with experienced timber frame and panel producers such as Vermont Timber Frames Inc, endowed with numerically-controlled design and fabrication capabilities, turnaround time from design to installation can be as short as 6 weeks. The rapid dry-in cycle times discussed earlier in turn allow the interior finish work to begin immediately after the structure is raised, thus reducing project completion times by half compared to conventional stick building.