Can the building be used in cold weather climates?
Yes, we have designed the building to be offered with radiant floor heat in both the bay(s) and the equipment room. The bay(s) will be plumbed with the radiant tubing. Once the building is set in the field, the excess tubing is run into the equipment room through a chase-way and landed on the supply and return manifolds of the boiler system. We supply all material for the entrance and exit slabs so your general contractor can complete the hook-ups in the field.