Can MFT be reclaimed in an acceptable timeframe?
MFT has not been proven to be reclaimable to a solid landscape in an acceptable timeframe. Long-term containment of fluid tailings/MFT is undesirable. The directive requires a specified amount of fluid tailings to be converted to a solid form. Existing MFT volumes are not specifically addressed in the directive.