Can I use a CDM small-scale methodology for a project that exceeds the threshold?
GHG programs such as the CDM provide simplified modalities and procedures for small-scale projects and one component of this can be small-scale methodologies. CDM small-scale methodologies have thresholds set upon them, either within the methodology or in the CDM rules. These thresholds must be observed and complied with when using such methodologies to develop VCS projects.
Related Questions
- Among the criteria to reject all bids are that (1) the bid exceeds the project estimate, or (2) the bid exceeds the appropriation. Doesn’t the project estimate have to equal the appropriation?
- When does CDM 2007 (Construction, Design and Management Regulations 2007) apply to a project?
- What are the different types of small-scale CDM project activities (SSC)?