Can I parallel the eLoads together to obtain higher power and current?
eLoad when the objective is to share the current. Paralleling the eLoad in other operating modes such as CR and CV will work properly; however the timing and setting of each eLoad will then become critical. For correct timing and equal current sharing, most AMREL eLoads can be master/slaved paralleled using their trigger inputs and outputs.
Related Questions
- Id like to power a low component count device via an output port bit on the pcs parallel port. Does anyone know the current sourcing spec for an output port bit?
- Where can I obtain more information about the Ontario Power Authority and federal programs that may provide additional rebates?
- How and where can I obtain whats needed to install and operate a parabolic trough power plant?