Can I avoid creating and can I detect existing loops with VISUALjob for TWS?
The earlier a loop is detected, the better. VISUALjob for TWS provides an analysis function during the design phase of a scheduling definition in order to check, as early as possible, if loops where accidently created. A loop analysis can also be performed on the entire schedule. Candidates for a potential loop will first be listed and then validated if they are real loops. No mainframe resources (e.g. trial plans) are required to perform loop analysis.