Can FRP panels be installed immediately upon delivery?
FRP panels should be unwrapped, stacked and stored indoor in a dry area. The panels have to be allowed to stand at ambient temperature at least 24 hours prior to installation. If at all possible, raise the room temperature above anticipated operating levels. The panels will contract as the temperature goes down.