Can AutoSimply integrate with ACCPAC Project and Job Costing (PJC) module?
Technically, there is currently no direct integration with the ACCPAC PJC module. Production costs generated in AutoSimply via MO processing can be recorded against the PJC contract/project using the PJC Material Usage transaction. In terms of tracking, we would recommend that the PJC contract number be inputted as MO reference. Reports can then be created to track and analyze MO’s based on project number.