Can an existing Suretrack or P3 file be converted into a flowline based schedule?
Yes it can. However, some of the information in P3 or Suretrack is not available that you need in Control such as location information. You can bring in the activities, but you would need to add in the location information manually to use Control to its full potential. Typically, the workflow we recommend is that you start in Control and then Control can export into P3, P6, and Microsoft Project. So you start in Control and then you export if you contractually, for example, are obligated to provide a Gantt chart or P3 schedule. An additional comment: I’m sure many of you are aware that both Suretrack and P3 are being phased out and they will no longer be supported. So, many of you will be looking at switching to P6 as one option. I think this would be a great time to have your company take a good look at Vico Control. Because you’re going to be learning a new program anyway so you want to have an opportunity to see how the flowline scheduling system could improve your ability to perfor
Related Questions
- Note that this label is based on the Letter Format and is effectively a Letterhead converted to a parcel label. How Do I Print the Current Name and Address as Labels?
- Is it really good educational practice to put the fifth grade with the eighth grade at the existing high school when it is converted to the middle school?
- Can an existing flat roof be converted to an inverted roof?