Can a single producing well be treated?
Yes, a single well stimulation method can be applied. This requires that the well be shut-in for about a week after the Titan nutrients are injected into the formation. A single pump and tank is all that is required for the injection. Most wells in the United States are suitable for injection immediately. Most reservoirs will be suitable for the Titan Process. After the injection is completed, approximately seven days is needed for the well to be ready to produce. If longer periods are available the Titan effect is magnified.