Can a BMP design not specifically shown in the BMP manual be submitted to the reviewing agency to demonstrate compliance with the 80% TSS reduction standard?
Any applicant has the option to submit an alternative BMP design to the review agency, with sufficient documentation to demonstrate the appropriate removal rates. If the project is the subject of a Division of Land Use Regulation permit, the use of a BMP that is not listed in the BMP manual must be identified in the permit application form. (Please note that this does not apply to manufactured treatment devices which are required to go through the certification and verification process as required under N.J.A.C. 7:8-5.7(c).
Any applicant has the option to submit an alternative BMP design to the review agency, with sufficient documentation to demonstrate the appropriate removal rates. If the project is the subject of a Division of Land Use Regulation permit, the use of a BMP that is not listed in the BMP manual must be identified in the permit application form. (Please note that this does not apply to manufactured treatment devices which are required to go through the certification and verification process as required under N.J.A.C.
Related Questions
- How does an agency demonstrate compliance with placement specifications for foster homes when we are not allowed to deal with cross-racial and cross-cultural matters?
- Can a BMP design not specifically shown in the BMP manual be submitted to the reviewing agency to demonstrate compliance with the 80% TSS reduction standard?
- The BMP manual includes minimum design permeability rates for groundwater recharge and infiltration BMPs. Is there a maximum permeability rate?