Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

By what methods does PM-SC (Power Manager-System Controller) control the load shedding function?

0
Posted

By what methods does PM-SC (Power Manager-System Controller) control the load shedding function?

0

Load shedding can be performed in two ways. First, the PM-SC is wired to the optional trip-to-neutral load shedding function on the Generac ATS. When energized, the switch goes to the neutral position and sheds load. This feature provides an automatic reset once adequate generator power or utility power returns. The second way to perform load shedding is by taking the PM-SC or PM-IC signal to the shunt trip function of the circuit breaker for the load to be shed. This requires a manual reset that may cause inconveniences during off-hours.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123