Before you first switch on your dual-fuel element we recommend; bleeding the system, bleeding the towel rail, closing both valves, then opening the exit valve a half-turn, to allow any pressure to escape when the element is on. Q: What does Suitable for open circuits mean?
The open circuit generally refers to the domestic hot water supply which comes through your taps. Brass & stainless steel towel rails can be fitted to the open circuit which will provide heat to the towel rail throughout the year. Should you wish to choose this method of heating, discuss this with your installer who will advise further. Dependant on your area water conditions you may require a special unit manufactured from DZR brass as aggressive water conditions can cause premature failure of your towel rail. Dezinctification is not covered by your guarantee. Q: Guarantees? A: There is a one year guarantee against manufacturer’s defects. In the unlikely event that the product is damaged in transit, we must be notified within 48 hours of delivery.
Related Questions
- Before you first switch on your dual-fuel element we recommend; bleeding the system, bleeding the towel rail, closing both valves, then opening the exit valve a half-turn, to allow any pressure to escape when the element is on. Q: What does Suitable for open circuits mean?
- Some Perfect Water systems have valves for dispensing water at different temperatures. Which system should I select for my needs?
- What does Gallagher recommend for grounding a permanent power fence system?