At what station on the four ramps is the “line” where the asphalt from Westport Rd. ends and the area where alternate pavement begins?
A bulletin will be posted to the web page providing an Adobe File showing the limits of the asphalt on Westport Road. The bulletin will be named “Additional Information” – Jefferson County – Call #200 – CID 081022. Basically the mainline on Westport Road from curb to curb will be asphalt. From the outside of the curb line up the ramps will be alternate pavement.
Related Questions
- If the alternate path of travel starts and ends some way before or after the construction area is any directional signage clear and of high contrast?
- At what station on the four ramps is the "line" where the asphalt from Westport Rd. ends and the area where alternate pavement begins?
- Can the JPC Pavement Drainage Blanket be used in lieu of the Asphalt Treated Drainage Blanket in the asphalt alternate?