At what stage in the project are assessment costs (i.e. installing a monitoring well) included in the EFS?
All assessment costs are coded with the Phase of Work (PWC) 2 until the time that a Corrective Action Plan (CAP) is received by OPS. If a CAP is requested with the condition that additional well(s) be installed, the cost to install these wells and any associated costs should be coded as PWC 2 and submitted on a separate reimbursement package than CAP related costs. If a CAP has been approved and a CAP Modification has been requested that includes installation of additional wells, these costs should be included in the EFS in PWC 3D, Activity Code (AC) k.