Are there specific requirements for an approved material allocation process?
Yes. • The method must be based on a reasonable allocation method. • The received weight of the material purchased must be used to calculate the allocations. • Operators must ensure that the weight of rejected containers, line breakage, and out-of-state containers is not included in the allocated weight. • Operators must account for each incoming load of material. • Operators must inspect incoming material to verify that it is eligible for refund value payments.