Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Are there separate requirements for fire alarm and fire suppression systems?

0
Posted

Are there separate requirements for fire alarm and fire suppression systems?

0

Yes, “Shop drawings” for these systems must also be submitted for review by a firm “certified” by the Bureau of Fire Services to do this work. Once again, a two to four week turn around time can be expected for these reviews. These systems must be approved before occupancy approval will be given. I don’t know the first thing about construction. Can you give me some basic things to look for in a building that might help me determine if the building is up to code? As stated above, we strongly suggest you retain an Architect or Engineer as soon as possible to assist you in determining facility needs. However, the following are some general requirements for school construction (not all inclusive). Construction: Section 10-1.6 of the rules (see page 6 of the state amendments) list construction requirements for school buildings. Some basic restrictions are: All buildings are limited in area per floor based upon the type of construction (see section 10-1.6). If a floor area is exceeded, a two

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123