Are there plans to extend or build new runways?
The Airport Master Plan includes new parallel runway 29L-11R which would be constructed south of the present primary runway. The new runway would also include necessary taxiway systems to connect to the existing network. These runway projects will be developed based on operational demand and availability of funding.