A. Yes. During repository construction and operation, as part of the performance confirmation program, DOE is required by 10 CFR 63.132 to establish a continuous program of surveillances, measurements, testing, and geologic mapping to ensure that the natural and engineered design features of the repository are confirmed, and to alert the NRC of any design changes needed to accommodate actual conditions. Surveys of the underground facility, descriptions of the material encountered, geologic maps and geologic cross-sections, and documents on seepage and dewatering systems are required by 10 CFR 63.
A. Yes. During repository construction and operation, as part of the performance confirmation program, DOE is required by 10 CFR 63.132 to establish a continuous program of surveillances, measurements, testing, and geologic mapping to ensure that the natural and engineered design features of the repository are confirmed, and to alert the NRC of any design changes needed to accommodate actual conditions.
Related Questions
- I do site surveys in many smaller cities that aren included in the AcuSat city database. Can I add extra cities to this database?
- I do site surveys in many smaller cities that aren included in the AcuSat city database. Can I add extra cities to this database?
- Should documents related to waste operations conducted during site characterization be included in the LSN?
- Should documents related to waste operations conducted during site characterization be included in the LSN?
- Are required site surveys and geologic mapping for performance confirmation to be included in the LSN?
- Are design confirmation documents required to be included in the LSN?