Are ongoing or future plans and schedules for engineering work required to be included in the LSN?
A. Plans and schedules for engineering work necessary to support construction, receipt of waste and emplacement of waste are required by 10 CFR 63.21. Progress reports on engineering activities during construction (including the identification of deficiencies in design and construction) are required by 10 CFR 63.32. Documents related to these topics should be included in the LSN.
Related Questions
- Should documents related to radiological protection, radiological engineering and radiation safety be included in the LSN?
- Should documents related to radiological protection, radiological engineering and radiation safety be included in the LSN?
- Are documents related to plans and schedules for construction and operations required to be included in the LSN?
- Are documents related to plans and schedules for construction and operations required to be included in the LSN?
- Are ongoing or future plans and schedules for engineering work required to be included in the LSN?
- Should plans for receiving and handling SNF or HLW at Yucca Mountain be included in the LSN?