Are instrumentation and control documents required to be included in the LSN?
A. Yes. The control of measurement and test equipment, including tools, gages, and instruments, is required by 10 CFR 63 Subpart G. Measures are required to ensure these devices are properly controlled, calibrated and adjusted at specified intervals to maintain their accuracy within necessary limits. Requirements for the control of measuring and test equipment are described in Section 2.5.1.3 Acceptance Criterion 12 of the Yucca Mountain Review Plan.
Related Questions
- Are documents related to shops, including instrumentation and control required to be included in the LSN?
- Are documents related to shops, including instrumentation and control required to be included in the LSN?
- Should documents related to the Emergency Response Control Room be included in the LSN?
- Should legal documents related to land ownership or control be included in the LSN?
- Should legal documents related to land ownership or control be included in the LSN?
- Are instrumentation and control documents required to be included in the LSN?