Are documents related to the plans, schedules, and conduct of engineering work during site characterization required to be included in the LSN?
A. 10 CFR 63.16 requires that “during the conduct of site characterization activities at the Yucca Mountain site, DOE shall report the nature and extent of the activities, the information that has been developed, and the progress of waste form and waste package research and development to the Commission not less than once every six months. The semiannual reports must include the results of site characterization studies, the identification of new issues, plans for additional studies to resolve new issues, elimination of planned studies no longer necessary, identification of decision points reached, and modifications to schedules, where appropriate. DOE shall also report its progress in developing the design of a geologic repository operations area appropriate for the area being characterized, noting when key design parameters or features that depend on the results of site characterization will be established.” All documents related to such reports to the NRC, including any comments from
Related Questions
- Are documents related to the plans, schedules, and conduct of engineering work during site characterization required to be included in the LSN?
- Are documents related to the plans, schedules, and conduct of site characterization activities required to be included in the LSN?
- Are documents related to the plans, schedules, and conduct of site characterization activities required to be included in the LSN?
- Should documents related to waste operations conducted during site characterization be included in the LSN?
- Who owns an engineers engineering documents (drawings, plans specifications, etc.)?