After Ive ordered my stairlift or bathlift, how long does it take for the installation to be complete?
Delivery and installation times do vary. Straight stairlifts and bathlifts can be delivered and installed within a few days of survey. Curved stairlifts are manufactured to your specific staircase requirements and therefore will take a little longer to be installed. Installation time for a straight stairlift is approximately 1 hour 30 minutes. A curved stairlift will take slightly longer. Bathlifts can be self-installed or we can fit it for you in about 15 minutes.